AusGroup Limited (“AusGroup”) is pleased to announce that subsidiary AGC Industries (“AGC”) has recently been awarded various contracts for construction and maintenance work, worth over AU$25M combined.

Additional work has been secured as part of its Master Services Contract with Chevron Australia. AGC will provide multi-disciplinary services including onsite structural, mechanical & piping, electrical & instrumentation and painting & insulation on the Chevron-operated Gorgon Project.

AGC has also been engaged to mobilise a Brownfield Execution Team to carry out various campaigned maintenance style works on the Gorgon and Wheatstone sites. Additionally, AGC will carry out a specialist scope of work on the Wheatstone offshore platform.

Furthermore, AGC will be working on BHP Iron Ore’s South Flank Project, through a contract awarded by Thyssenkrupp Industrial Solutions. AGC has been commissioned for the supply, fabrication, surface treatment, trial assembly and delivery of the RC03 reclaimer substructure, the largest of its kind in Australia. The substructure work includes fabrication of the reeler platform, cross equalisers and all associated secondary and tertiary steel structures.

Managing Director and CEO Shane Kimpton said, “We are pleased to showcase our diverse service offering to existing and new clients and are proud to be working with thyssenkrupp on the South Flank Project to deliver Australia’s largest reclaimer, fabricated at our Kwinana facility in Western Australia.

Our location provides us with the ability to design, construct and transport the structure via Perth’s high-wide load corridor to the Australian Marine Complex, which will be a significant operation. Our Chevron project team has been instrumental in delivering continuous efficiencies and innovations on our current Chevron contract, leading to an expanding scope of work, which is great to see. We look forward to the successful delivery of these projects.”