A Complete Resources Solution

At AusGroup, we specialise in providing complete solutions for projects within the minerals resources sector.

Our suite of services is one of diversity, offering practical and pragmatic solutions throughout all
aspects of a project lifecycle across multiple disciplines.

With a focus on “pain-free contracting”, our core client values of Integrity, Delivery Agility and Certainty are embedded within the culture of each delivery team to ensure clients’ needs and expectations are consistently exceeded.

Focussed and specialised services

Our streamlined in-house service offering, using integrated multidisciplinary teams, for both Greenfield and Brownfield Resource’s projects.

Asset and Project Life cycle solutions

CASE STUDIES

Dampier Salt Truss, Lifting Bean and SS Chute Fabrication (CV02)

The Project Dampier Salt engaged AusGroup to fabricate, assemble and deliver various replacement components of the…

Dampier Salt Stacker Fabrication and Install (CV007)

As part of contract CV007 AusGroup fabricated approx. 77t of steelwork fabrication for a replacement stacker…

Rio Tinto – Rope Access Maintenance Crews Pilbara Mine Sites

AusGroup was contracted by Rio Tinto to provide a pool of Rope Access technicians for maintenance…

Dampier Salt Mine Twin Stacker Boom

AusGroup was commissioned to fabricate, machine, surface treat, assemble and install the two CV401 & CV402…

Fabrication of complete Long Travel Bogie Assemblies

AusGroup were contracted by the client to fabricate, assemble and transport 4 ship loader long travel…

Tianqi Lithium – Kwinana Lithium Hydroxide Processing Plant

Aus Group was awarded a contract to provide piping and insulation works on the LHPP1 Crystalliser…

CSBP Brownfield Maintenance and Support Services

AusGroup were awarded a contract brownfield maintenance and in 2020 to provide support services for the…

BHP Nickel West Shutdown and Maintenance

AGC were awarded the Removal and Replacement of Hot Heat Exchanger (HHeX) Project to be executed…

Rio Tinto Cape Lambert Screenhouse Rebuild

AusGroup was commissioned for the supply, fabrication, surface treatment and assembly of structural steel, platework, handrails,…

FMG Spirals and Launder Changeout

Material supply, existing spirals removal, steel modification and replacement with new spirals and launder systems including…

FQM Ravensthorpe Shoemaker Levy Project – Conveyor Truss Assembly

Assembly, verification and shipment of 33 prefabricated truss sections for a 9KM overland conveyor.

Reclaimer Construction

Construction of the World’s largest on-rail Reclaimer. 846.9t of Fabrication, trial assembly of every component ensuring…

Sino Iron Project Power Plant – Thermal Insulation

The scope involved the application of thermal insulation and cladding to piping and equipment for the…

Rio Tinto Alcan Yarwun – Maintenance Contract

AGC was commissioned to provide Yarwun with a range of integrated services including; refractory, mechanical and…

Queensland Alumina Limited (QAL) – Integrated Maintenance Services

With our regional operations situated less than 30km from QAL’s Gladstone facility, our outage team performed…

Liberty OneSteel Whyalla Steelworks – Refractory Installation Services

AGC was awarded a three year refractory services contract with Liberty OneSteel for site-wide management, planning…

Karara Iron Ore Project SMP Preferred Supplier

Following the award of the Early Works Contract in March 2011, AGC continued to support Karara…

Karara Early Works Contract

AGC was engaged to provide the structural, mechanical and piping installation works and procurement of piping,…

Jimblebar Iron Ore Mine

AGC was selected as the contractor for works on the expansion project. The scope was for…

CSBP Ammonium Nitrate Expansion Project – Prilling Plant Upgrade

The contract included debottlenecking works to the existing prilling plant and was be undertaken at CSBP…

Cloudbreak Iron Ore Mine Expansion

AGC and Kiewit partnered in a JV for the contract which included the addition of; a…

CBH Ship Loader Refurbishment Contract

AGC was contracted to refurbish Ship Loaders 3 and 4 at Kwinana for CBH. The scope…

Barrick Porgera Gold Mine

AGC was awarded a 24 month service agreement, with the scope of works involving the provision…

Alcoa of Australia Multidiscipline Services Contract

AGC was awarded a five year contract covering a range of mechanical, electrical and scaffolding services.…

Worsley Alumina Refinery – Scaffolding Contract

MAS Australasia was awarded a two year plus one year option for maintenance services scaffolding at…

Talison Lithium CGP2 Project – Structural, Mechanical and Piping Installation

MSP Engineering Pty Ltd has awarded AGC Industries Pty Ltd the contract to install approximately 2,000+…

Yara Pilbara Ammonia Plant

Yara Pilbara’s ammonia plant underwent a major turnaround in July 2018. For this window, AGC executed…