The East Rockingham Waste to Energy Project (ERWtE) is a 300,000 tonne-per-annum waste to energy facility.  On completion the facility will deliver a cost-effective waste treatment solution and a vital source of dispatchable renewal energy, whilst achieving a 96% diversion of residual waste from landfill.

The Scope

With previous experience at Kwinana Waste to Energy Project, AusGroup was contracted to pre-assemble 8 x modules (cubes) at our facility at Beach Street, Kwinana and on completion transportation to site.  Overall breakdown of works included:

  • Receiving and checking materials using Track Base
  • Sorting materials for both pre-assembly and site works
  • Transportation of Site only materials to the project location
  • Pre-assembly of structural steel into transportable modules (cubes, towers or panels)
  • Transportation envelope planning from AusGroup Kwinana facility to the project location
  • Transportation of pre-assembled Modules to site

CASE STUDIES

BHP Nickel West Shutdown and Maintenance

AGC were awarded the Removal and Replacement of Hot Heat Exchanger (HHeX) Project to be executed…

Tianqi Lithium – Kwinana Lithium Hydroxide Processing Plant

Aus Group was awarded a contract to provide piping and insulation works on the LHPP1 Crystalliser…

Wheatstone Loading Arm Remediation

The Product Loading Facility (PLF) Loading Arm Remediation Project was initiated to provide permanent solutions for…