Fabrication of the boiler and baghouse sections  for a waste to energy power plant.  The fabricated sections were transported to the waste to energy power plant included casing which houses the filter for the exhaust fumes from burning off the waste.

To mitigate high risk and save time during on-site construction, AusGroup optimised the panelling for the boiler tubes by prefabricating
larger panel sections prior to shipping to site.