The Scope

AusGroup carried out one of the highest profile jobs for the shutdown which includes the removal of the old HHeX and all supporting ducts, followed by the installation of the new HHeX with newly configured ducts, insulation and support towers.In preparation, the HHeX was relocated from the laydown area to the staging area onsite ready for the shutdown.

The removal and installation of the HHeX required powerline works, multiple dual crane lifts and a specialised truck to manoeuvre the HHeX that weighed 140 tonnes and measured 26 meters in height.

AusGroup Kwinana Operations played an integral part of the shutdown by fabricating the new stainless steel ducts and support towers made from exotic metals.

CASE STUDIES

INPEX-operated Ichthys LNG Project – Painting, Insulation & Fireproofing

AGC Meisei Joint Venture (AMJV) was awarded the contract for the onshore facilities of the INPEX-operated…

FQM Ravensthorpe Shoemaker Levy Project – Conveyor Truss Assembly

Assembly, verification and shipment of 33 prefabricated truss sections for a 9KM overland conveyor.

Yara Pilbara Ammonia Plant

Yara Pilbara’s ammonia plant underwent a major turnaround in July 2018. For this window, AGC executed…