Fabrication Location – Kwinana workshop
- Bay 1 Carbon Steel Fabrication
- Bay 2 Stainless Steel Fabrication
- In-House painting
- Assembly in Bay 1
Client Site Location
These project works were destined for the client’s salt processing location at their Lake MacLeod (Site) in the Gascoyne region of Western Australia, approximately 900 km North of Perth. The Project Site is located within the SP1 stockpile area at Lake MacLeod’s out loading facility at Cape Cuvier.
A Client Win
AusGroup provided a one-stop-shop fabrication, assembly, PIF and installation solution for the client with all 3rd party inspections being complied with throughout the process.
An AusGroup Win
The client was extremely impressed with the timeline AusGroup achieved and our agility when we had to react to change.
CASE STUDIES
Offshore Asset Decommissioning
As part of the decommission and removal of two retired offshore gas field assets in WA,…
Rio Tinto Alcan Yarwun – Maintenance Contract
AGC was commissioned to provide Yarwun with a range of integrated services including; refractory, mechanical and…
Chevron Gorgon ABU Turnarounds 101 & 106
AusGroup were awarded the delivery of PIF and Access for Gorgon’s TAR101 and TAR106 from Phase…