
The Project
Fabrication and assembly of 4 complete long travel bogies including:
- 2-wheel Bogies
- 4-wheel equalizers
- 6-wheel equalizers
- 12-wheel equalizers
- Specialist machining and welding
- Painting and surface treatment
- Transporation to NSW
CASE STUDIES
Gorgon CO2 Coatings and Insulation
The Project AusGroup was engaged to provide PIF services at the Gorgon facility as part of…
Acciona Waste to Energy Modules
East Rockingham Waste to Energy Project (ERWtE) Boiler Hall Structural Offsite Pre-Assembly
Tianqi Lithium – Kwinana Lithium Hydroxide Processing Plant
Aus Group was awarded a contract to provide piping and insulation works on the LHPP1 Crystalliser…