The Project

Fabrication and assembly of 4 complete long travel bogies including:

  • 2-wheel Bogies
  • 4-wheel equalizers
  • 6-wheel equalizers
  • 12-wheel equalizers
  • Specialist machining and welding
  • Painting and surface treatment
  • Transporation to NSW

CASE STUDIES

Offshore Asset Decommissioning

As part of the decommission and removal of two retired offshore gas field assets in WA,…

Woodside LTCS Bore Spools and Pipes

Fabrication of low temperature carbon steel (LTCS) and duplex bore spools and large pipe bridges and…

Woodside-operated North West Shelf (NWS) Project – Karratha Gas Plant (KGP) Multidiscipline Services Agreement (MDSA)

The scope of work focused on mechanical works, structural steel, site installation and welding, inspection, cladding…