Fabrication of 12 x lime silos at our Kwinana hub. Each of them are 6.5m in diameter, 17m long and weigh 22T.

A ‘semi-automated’ welding process was used for all the associated long fillet welds which gives higher deposition rates, leaves a neater weld whilst saving time.