The Project

The 150 dedicated multidisciplined Rope Access technicians conducted fixed plant shutdown maintenance works on various mine site assets, including:

  • Liner replacement of chutes and primary crushers
  • Condition monitoring; weld integrity checks and thickness testing
  • Detailed reporting
  • Grizzly finger & cassette changeouts
  • Conveyor maintenance (e.g. roller and pulley changeouts)

The work scope was expanded by the client to include 30 ground support crew working on the shutdown circuit.

CASE STUDIES

INPEX-operated Ichthys LNG Project – Rope Access Trade Services

MAS Australasia was awarded a contract from Clough Projects International to supply rope access trade services…

Wheatstone onshore and offshore turnaround (TAR 501)

  AusGroup was awarded the Primary Maintenance Contract (PMC) for the delivery of Wheatstone’s first major…

CBH Ship Loader Refurbishment Contract

AGC was contracted to refurbish Ship Loaders 3 and 4 at Kwinana for CBH. The scope…