The Scope

AusGroup, as the Primary Maintenance Contractor (PMC) for our client, performed this 2nd Turnaround project which included:

  • Event management; planning and scheduling
  • Work packing – Permits/isolations
  • Mechanical, Electrical and Instrumentation work
  • Painting, insulation and fire proofing work
  • Scaffolding, lifting and rigging
  • Production support
  • Materials and resource supply
  • Quality control
  • Completions activities

Performance Summary

  • POB – 922 (825 D/S and 97 U/S)
  • 1391 Job Packs
  • >150,000 ‘Person’ hours
  • 0 Days away from work (DAFW)
  • 0 Loss of containment (Tier 1, 2 and 3)

 

 

CASE STUDIES

Tianqi Lithium – Kwinana Lithium Hydroxide Processing Plant

Aus Group was awarded a contract to provide piping and insulation works on the LHPP1 Crystalliser…

Karara Early Works Contract

AGC was engaged to provide the structural, mechanical and piping installation works and procurement of piping,…

Sino Iron Project Power Plant – Thermal Insulation

The scope involved the application of thermal insulation and cladding to piping and equipment for the…