The Scope

With previous experience at Kwinana Waste to Energy Project, AusGroup was contracted to pre-assemble 8 x modules (cubes) Bag and Boiler House structures and Hoppers at AusGroup’s Kwinana Operations, which features a large laydown and assembly area >25,000m2, transportation to site and onsite installation.  Overall breakdown of works included:

  • Receiving and checking materials using Track Base
  • Specialist fabrication and welding
  • Pre-assembly of 8 x Modules
  • Specialist fabric filters and insultation on the Hoppers
  • Pre-assembly of structural steel into transportable modules (cubes, towers or panels)
  • Transportation envelope planning from AusGroup Kwinana facility to the project location
  • Transportation of all structures to site

 

Watch the video here.

CASE STUDIES

CSBP Brownfield Maintenance and Support Services

AusGroup were awarded a contract brownfield maintenance and in 2020 to provide support services for the…

Chevron Gorgon BOG Flare Maintenance

The scope involved recoating the entire BOG Flare pipeline in the SA Modules. The larger diameter…

INPEX-operated Ichthys LNG Project – Module Insulation

AGC was contracted for the supply, fabrication and installation of all Cryogenic, Acoustic and Hot Insulation…