The scope of the overall project included the redesign and replacement of loading line pipework, pipe supports, process design, control valves and instrumentation for each of the four LNG loading arms A,B,C & Hybrid.

The Project includes:

  • Offsite engineering support provided from constructability & HAZID inputs along with workpack and detailed schedule development for all disciplines
  • The project design and installation sequence development
  • Removal of the existing and installation of the new DN600 & DN750 spools, valves, supports and ancillaries
  • Offsite spool and support fabrication
  • Onsite SMP, E&I, Access, PIF & Rope Access services
  • Approx. 10,000m of cables ran alongside the jetty using a team of Rope Access and E&I Technicians.

 

CASE STUDIES

FMG Spirals and Launder Changeout

Material supply, existing spirals removal, steel modification and replacement with new spirals and launder systems including…

Nyrstar Zinc Works – Shutdown, Refractory and Associated Works

AGC was selected as Nyrstar’s refractory and scaffolding contractor for its 2014 and 2017 Major Turnarounds.…