Continuous Improvement Initiatives

  • To streamline production all metal cladding and insulation are CAD-CAM and CNC cut. QA check done at third party automated cutting company to avoid delay on schedule and rework downstream.
  • Items are packed by work packs and labelled for ease of traceability and identification to avoid any form of double handling.
  • Proposed change of design for the spacers for the personnel protection metal cladding, with the benefit of streamline fabrication and installation and therefore offering saving to the client.
  • Extended cross-checking and communication between site survey personnel and fabrication team to simplify manufacturing process and increase efficiency on the shop floor avoiding rework.

CASE STUDIES

Yara Pilbara Ammonia Plant

Yara Pilbara’s ammonia plant underwent a major turnaround in July 2018. For this window, AGC executed…

Turnaround Maintenance Project for LNG Upstream and Downstream

The Project The second of the planned turnaround maintenance programs for a key LNG operator in…

INPEX-operated Ichthys LNG Project – Module Insulation

AGC was contracted for the supply, fabrication and installation of all Cryogenic, Acoustic and Hot Insulation…