Continuous Improvement Initiatives

  • To streamline production all metal cladding and insulation are CAD-CAM and CNC cut. QA check done at third party automated cutting company to avoid delay on schedule and rework downstream.
  • Items are packed by work packs and labelled for ease of traceability and identification to avoid any form of double handling.
  • Proposed change of design for the spacers for the personnel protection metal cladding, with the benefit of streamline fabrication and installation and therefore offering saving to the client.
  • Extended cross-checking and communication between site survey personnel and fabrication team to simplify manufacturing process and increase efficiency on the shop floor avoiding rework.

CASE STUDIES

Sino Iron Project Power Plant – Thermal Insulation

The scope involved the application of thermal insulation and cladding to piping and equipment for the…

BHP Nickel West Shutdown and Maintenance

AGC were awarded the Removal and Replacement of Hot Heat Exchanger (HHeX) Project to be executed…

Woodside LTCS Bore Spools and Pipes

Fabrication of low temperature carbon steel (LTCS) and duplex bore spools and large pipe bridges and…